Banner-Dong-Mai
Banner-Dong-Mai-01
Banner-Dong-Mai-02
Giao-thong-KCM

Internal traffic

– The width of main roads with 2 lanes is 43 m and the branch roads is 27 m and 15 m.
– The road of Industrial Park is designed to connect to Highway 18,which is convenient for transportation.

He-thong-dien

Power supply

Power is supplied from the national grid through 110/22KV, transformer station with capacity of 1 x 25 MVA and 1 x 16 MVA.

He-thong-xu-ly-nuoc

Water supply & Drainage system

Water supply
Water source is taken from Yen Lap equable lake connecting back to supply for water treatment station in the Industrial Park with capacity of 6,500 m3/day. The diameter of water supply pipe is D100 mm – D500mm.

 

Drainage system
Rain water drainage system is constructed separately with waste water drainage system in the IP . The diameter of underground rain-water drainage pipe is D600 mm – D1000mm with the principle of automatic drainage.

Waste and waste water treatment

– Waste water treatment Station with capacity is 4,800 m3/day.(Industrial waste water is by 80% the quantity of water supply).
– The diameter of waste water drainage pipe is D300mm – D500mm
– Solid Waste from factories in the IP shall be categorized immediately in every factory and be collected to the centered treatment area of Quang Ninh Province.

Internet

Telecommunication system – Internet

– Telecommunication system reach the international standard
– Underground cable system is connected directly to the fence of every factory.